Seems like things are getting worse. It appears that the containment vessel and the pressure vessel (outer protective concrete shell) are both breached, radiation on outside is increasing above safe levels, and all plant personnel are being evacuated except maybe just a few. Water used for emergency cooling is leaking out faster than they can pump it in.
Untranslated to English on the TV, but translated by my wife, the Prime Minister has talked to the plant operators telling them "prepare yourselves, only you guys can do this." Got it?
The information being provided is sketchy, maybe there is little information. Why don't they have cameras and robots in there?
Pages
- Home
- The Legal -- Standard Terms and Warranty
- Micro-Inverter Info
- Hot Water Tips and Maintenance
- Tax Benefit Links
- Resources
- No-Brainer Ways to Save at Your House
- Links to Other Solar Companies
- Financing Solar Systems
- Extra Services
- How to Read NEM Electric Meter
- Typical Hot Water Warranties (American, Sunpro, Grundfos, STECA, TACO, Little Gray Box)
- Typical Hot Water Products In Our Most Common System -- Manufacturer Literature (not warranties)
- HECO Program DOC
- Lights
- Bat Design
- One Lines
- Bat Design
- Enphase 2022 New Component names
- Pricing
- Elec Design
No comments:
Post a Comment